Author Topic: Early Matrix planning  (Read 1716 times)

Offline pmbarber

  • Newbie
  • *
  • Posts: 22
    • View Profile
Early Matrix planning
« on: January 16, 2018, 07:02:22 AM »
Hello. Last season was my first show, and for short amount of planning and supplies it turned out well. Of course knowing what I know now, I need to plan earlier for expansion. I definitely want to do a window matrix or two. I see the pre-made matrix panels on different sites for sale, but what would be the problem with using regular peg board from Lowe's or Home depot to get the same results? I know I would have to drill the holes a little larger, but wouldn't they serve the same purpose? Thank you for your input.

Offline jnealand

  • Hero Member
  • *****
  • Posts: 1421
    • View Profile
Re: Early Matrix planning
« Reply #1 on: January 16, 2018, 09:21:31 AM »
The problem with pegboard is moisture.  Once it gets wet it will be all over with.  The other problem for a window is that you cannot see through it.  I used plastic fencing material with a 1/2" grid from Home Depot (other hardware stores carry the same kind of stuff).  I have two window matrices and we can see out the windows just fine.  With the 1/2" spacing you can also pick your node spacing.  I used 2" just because it allowed me to get 20 columns across the window and it worked great, but you could use 3", 1", or 1.5" etc.  I put two 1x2 boards together using a short piece of scrap 1x2 between them and it really helped being able to push the nodes thru the plastic - plus a pair of mechanics gloves.  LOL.
Jim Nealand
Kennesaw, GA

Offline pmbarber

  • Newbie
  • *
  • Posts: 22
    • View Profile
Re: Early Matrix planning
« Reply #2 on: January 16, 2018, 01:06:43 PM »
Jnealand, nice tips on the issue with using peg boards. Moisture and visibility would definitely be a problem. I like what you made you matrix out of, I think that would work for me too.

Offline jnealand

  • Hero Member
  • *****
  • Posts: 1421
    • View Profile
Re: Early Matrix planning
« Reply #3 on: January 16, 2018, 06:21:05 PM »
Always seems to work best to start your matrix at the bottom left looking at the front, assuming that you are connecting at the bottom.  That is why you see in the picture with the jig I am working in the middle.  I started by looking at the back and had to pull the nodes out and restart.
Jim Nealand
Kennesaw, GA