OK we are closer,
now when in the test mode of xlights I can get the ports to operate the lights
<network NetworkType="E131" ComPort="192.168.2.63" BaudRate="76" MaxChannels="510" Description="Santa Lights"/>
But when I set up the LOR controller as com 3 unit 1 should I have told it that it is NOT the controlling unit?
when testing one of the sequences it is still not operating